Onshore wind farm Slufterdam Maasvlakte
The Slufterdam wind farm project mainly consists of removing 18 existing wind farm structures, including the wind turbine foundations.
Wind Farm Slufterdam – Maasvlakte 1
After that, the construction can begin of all park roads, crane locations, SCADA infrastructure, park cabling, and customer substations, collectively referred to as the Balance of Plant. All of this to be able to install wind turbines with a capacity of 4 MW each.
New access roads
Crane setup locations
Wind turbine foundations
Electrical installations, including substations for 14 wind turbines